Dubai Completes the Second Vertiport for Its Planned Airport Air-Taxi Route
The Marina facility joins the certified site beside Dubai International Airport. Commercial service still depends on operational approvals and readiness.
Published November 19, 2026Intelligence / Transportation / Urban Air Mobility

Dubai has completed and certified the Marina landing site for Joby’s planned air-taxi connection to Dubai International Airport. Skyports Infrastructure announced the milestone with the Roads and Transport Authority on November 18; the certification ceremony took place on November 3.
The two permanent endpoints give the operator places to land, charge and handle passengers. Skyports says commercial service remains subject to operational approvals and readiness.
What Dubai bought time for
The first agreement makes a useful yardstick. In February 2024 Joby described a six-year exclusive right to operate air taxis in Dubai and identified four initial locations with its partners: the international airport, Palm Jumeirah, Dubai Marina and Downtown. The announcement targeted an early-2026 start and allowed for earlier initial operations. November’s completed Marina facility is the second endpoint in a program first described as a four-site network. Two connected sites give an operator one point-to-point link. Four sites could support as many as six distinct pairs if all were connected. Neither exclusivity nor a finished pad tells a traveler which of those routes will operate, or at what frequency. Joby’s original agreement and site list
The gap between the original target and this milestone is important for investors and passengers for different reasons. For an investor, much of the early network expenditure is incurred before enough flights take place to spread it across paying seats. For a passenger, a short flight helps only when a seat is available near the time a train or road journey would depart. The first published timetable and a sequence of days actually flown will say more about the transport service than another point-to-point demonstration.
Keeping the landing pad clear
The Marina vertiport has one elevated landing pad, a charger and a passenger terminal. An adjoining parking area allows an aircraft to be moved off the pad so another can use it.
That arrangement separates parking from the space needed for arrivals and departures. At a single-pad facility, an aircraft occupying the landing area prevents the next one from touching down. Turnaround procedures therefore influence how much service the site can offer, alongside the number of aircraft available.
The charger and the parking position matter as much as the pad for repeat service. Consider two aircraft due close together. If the first can unload and clear the pad, the second can land while the first is being readied. If the first has to stay on the pad for charging or boarding, a short flight can still lead to a long queue. One delayed arrival then affects the timetable in both directions. Published facility specifications tell passengers that the necessary spaces exist. An operating schedule would reveal how much time the carrier allows for each turn.
Airport designers also have to look beyond the painted landing area. The FAA’s vertiport engineering brief, a useful comparison from another jurisdiction, addresses the area exposed to rotor downwash and outwash. On an elevated urban site, where people stand and how they move between the terminal and aircraft matter alongside the pad dimensions. Dubai’s own authorities govern the Marina operation. FAA vertiport design brief
From a test route to an airport connection
Joby has previously flown between separate locations in Dubai. Its November 9, 2025 demonstration took a piloted aircraft from the Margham test facility to Al Maktoum International Airport in 17 minutes. That flight used a different airport and different endpoints from the planned Marina–Dubai International service.
The earlier flight demonstrated a point-to-point journey. Passenger operations also require coordinated boarding, aircraft servicing and onward ground connections. For an airport traveler, each of those activities takes time outside the flight itself.
Skyports projects a flight of under ten minutes on the new route, compared with approximately 35 minutes by road. The Marina site is a short walk from Al Fardan Exchange Metro Station. A passenger transferring from the metro would still need to reach the vertiport, board and make the connection from the airport-side facility to the departure terminal.
Those transfers must be included when comparing the complete journey. The published flight-time estimate does not establish the time from a passenger’s starting point to the airport terminal.
Sources
Skyports: Marina completion, certification and facility specifications, November 18, 2026
Joby: Margham–Al Maktoum flight, announced November 17, 2025