Italy can meet its renewable power target and still turn away more clean electricity
Italy’s first national flexibility assessment explains why the grid can meet its operating requirements while turning away more renewable power.
Published November 21, 2026Intelligence / Energy / Grid Technology

On a sunny spring holiday, Italian factories and offices can need less electricity just as solar panels are producing more. A battery with room to charge can take some of the surplus. A transmission line can carry some to buyers elsewhere. Once the available outlets fill, Italy’s grid operator has to ask renewable generators to turn down. Demand and supply must balance even when the electricity on offer costs little to produce.
Italy’s first national assessment of power-system flexibility puts a scale on that problem. Terna, the transmission operator, reports that Italy curtailed about 0.9 terawatt-hours of renewable electricity in 2025, around 0.7% of what renewable sources could have produced. In its simulations the average rises to 7.6 terawatt-hours in 2030 and 10.1 in 2035. Yet Terna finds that the resources in its scenarios can meet the flexibility requirements it evaluated in both years.
The apparent puzzle lies in what Italy is trying to achieve. Its 2030 target calls for renewables to cover 63% of electricity demand. The modeled grid reaches that share on average while leaving 3.3% of producible renewable energy unused. The first percentage counts renewable power delivered against all the electricity Italy needs. The second counts the energy turned away against all its renewables could have generated. Italy can build enough solar and wind to supply a much greater share of the country’s electricity over a year while also losing more generation when the grid cannot absorb the next unit of solar output.
Italy’s energy regulator, ARERA, approved the assessment on November 17 and published it the following day. Terna ran the system envisaged for each target year through eight different weather years. The assumed solar and wind fleet grows from 57.1 gigawatts in 2025 to 107.4 in 2030 and 133 in 2035. The model also allows for plant ramping limits, power exchanges with neighboring zones, and reserves that can raise or lower output when forecasts miss. A grid operator needs that room to maneuver even on a day with abundant sunlight.
What changes between 2030 and 2035 is chiefly how much power must be turned down at once. Terna finds roughly 4,000 hours with some curtailment in both 2030 and 2035. The average annual loss rises by about a third across those five years, reaching 3.7% of producible renewable electricity in 2035. Across the eight weather cases that year, it ranges from 8.4 to 14.3 terawatt-hours. A spring weekend can strain the grid’s ability to absorb energy much more than its total for the year would suggest.
The outcome already assumes substantial storage construction. Terna includes about 50 gigawatt-hours of utility-scale storage by 2030 and 82 by 2035. It identifies 10 gigawatt-hours already contracted through the storage procurement auction for 2028. Under the assumed buildout, renewables cover about 70% of 2035 demand on average, above the study’s 68% reference level. A delay in building those resources would change the result.
In the most severe modeled hour, the renewable power cut approaches 45 gigawatts in 2030 and nearly 60 in 2035. Buying enough batteries to absorb the very highest peak would mean paying for charging equipment that might seldom operate. A battery also needs empty space when the surplus arrives, and a later buyer for what it discharges. Some energy is lost on the round trip. A new line helps where the obstacle is geography and another region can take the power. A factory able to shift electricity use into the afternoon can absorb some surplus at the source, but only as much as its production schedule permits.
That leaves a practical investment question even after Italy meets its target. Storage that charges on many ordinary afternoons and displaces gas after sunset may earn its keep without absorbing the last midday spike. Terna itself leaves open an economic case for additional storage to reduce gas use. The most valuable hours to recover may be the ones that recur often enough to pay for the equipment.
Sources
ARERA decision and publication record · Terna assessment, figures 20–21 and renewable integration results · ARERA’s underlying renewable generation report